6,970 judgments 29,205 public-register documents 143,540 judgment pages 132,515 public-register pages 276,055 total pages
Judgment · jid 5565 · pdb #3352

BTU Power Management Company and BTU Power Company v Abdul Mohsen Hayat - Ruling (Costs)

G 0444/2007 · 2009-06-01

Non-compliance with directions; Unless order; Indemnity costs; GCR O.62 r.4(11); Conduct improper/unreasonable/negligent; Failure to seek extension; Costs of earlier contested hearing wasted

All PDF copies on file (2)

Every PDF we hold for this judgment is listed here, including legacy versions pulled from earlier upstream pipelines. Each carries a provenance note so the source of each copy is explicit.

PDB 20 May 2026 CURRENT
09-06-01-BTU-Power-Management-v-Abdul-Mohsen-Hayat.pdf
799.57 KB · md5 3a41be8b10bf7cee93b791849273df85
Downloaded 2026-05-20 from the new judicial.ky Participants-Database release at https://judicial.ky/n0c-storage/judgments-repository2/09-06-01-BTU-Power-Management-v-Abdul-Mohsen-Hayat.pdf.
CSV 13 Apr 2025 CURRENT
4K0BPBYXYSFA1DE608CA57AE1B57AF730791BD325604013B7F80.pdf
191.7 KB · md5 726956589b299532a25e9a5467814330
Legacy box_files copy — originally downloaded under jid=66 from the now-frozen judicial.ky CSV pipeline (Box.com signed-URL AJAX action=dl_bfile). Kept on disk for reference; the PDB release is the canonical current version. | re-homed from jid=5565 (identity-slide repair 2026-06-12)
Full metadata
Find similar